US NEVI Charger Requirements: A Buyer's Summary

A buyer's summary of the US NEVI charger rules: ports, power, uptime, connectors, communication, Buy America and payment. Confirm the current text.

Prepared by
VULTAE Engineering Team
Published
Reading time
3 min
Sources
2 references

Key takeaways

  1. 1NEVI is the US federal programme that funds fast charging along highway corridors. Its rules for stations funded with that money cover the number of ports, the power per port, uptime, connectors, communication, payment and domestic content.
  2. 2The rule text and programme guidance have changed since 2023, and states add their own requirements. Treat this page as a reading guide, then check the current federal regulation, your state’s documents and the tender.
  3. 3For a supplier the practical questions are: does the charger meet the connector and power requirement, which protocol and security features are required, can it show Buy America compliance and can it hit the uptime target in service.
A US interstate rest stop at dawn with four DC fast chargers in a row and cars plugged in
A US interstate rest stop at dawn with four DC fast chargers in a row and cars plugged in
Contents
  1. 01What NEVI regulates
  2. 02What it means for chargers
  3. 03Uptime in practice
  4. 04Buy America
  5. 05A checklist for bidders

Short answer: NEVI sets minimum technical requirements for fast-charging stations paid for with federal money. They are a useful checklist for any serious DC project, but the current rule and your state’s tender decide what applies.

What NEVI regulates

Topic What the 2023 rule set out
Station size At least four ports, able to deliver power at the same time
Power per port A minimum of 150 kW per port, simultaneously
Connectors CCS Type 1 on every funded port; other connectors may be added
Uptime A minimum of 97% per port
Hours Open to the public, 24 hours a day, every day
Payment Contactless card and other methods without membership or an app
Pricing Prices shown in dollars per kWh
Communication Network protocols and security features specified in the rule
Data Reporting on uptime, sessions and prices
Domestic content Buy America requirements for funded equipment

The figures come from the 2023 final rule; programme guidance and some state rules have been revised since then. Check 23 CFR 680 and the FHWA page for the current position.

What it means for chargers

  1. Power: a station needs several ports able to deliver the minimum power at once, so the charger and the grid connection must support it; see grid power for a DC site.
  2. Dual-gun sharing: power sharing between guns can fall below the minimum when both are in use; see single-gun vs dual-gun power sharing.
  3. Connectors: CCS1 cables and the choice of NACS in addition; see NACS.
  4. Communication and security: OCPP and ISO 15118 requirements; see OCPP 1.6J vs 2.0.1 and cybersecurity requirements.
  5. Payment: a card terminal on the charger; see payment terminals.
  6. Safety listing: a listing such as ETL or UL; see UL 2594 and UL 2202.

Uptime in practice

A 97% target means a port can be out of service only a small number of hours a month. The measure is defined in the rule, including what time is excluded. Build it into the hardware plan: spare parts, remote diagnostics and a fast service response. See uptime and KPIs for charging networks.

Buy America

Funded projects must meet domestic-content requirements, with rules for the assembly and for the content of the equipment. This is a legal question specific to each project and product; do not assume a given charger qualifies. Read importing EV chargers into the US and ask the project owner for their interpretation.

A checklist for bidders

Question Owner
Which version of the rule and state guidance applies? Project owner
Port count and power per port Charger and site design
Connector set and cable length Charger
OCPP version and security Charger and platform
Safety listing Charger
Buy America position Supplier and legal adviser
Service and uptime plan Operator

VULTAE makes DC chargers with CCS1 and NACS options for North America; we will confirm the exact specification and listing for your project. This is a summary, not legal advice.

Questions buyers ask

Is NEVI mandatory for every charger in the US?
No. The requirements apply to stations funded through the NEVI programme. Private stations built without that money follow other rules, such as local electrical codes and utility requirements.
Which connector does NEVI require?
The 2023 final rule required CCS Type 1 connectors on funded stations, with other connectors allowed in addition. Check the current regulation and state guidance for updates, including NACS.
Can a Chinese-built charger be used?
Domestic-content rules apply to funded projects, so a project-specific analysis is needed. Talk to the project owner and legal adviser before you quote.

References

  1. [1]23 CFR Part 680, National Electric Vehicle Infrastructure Standards and Requirements. Electronic Code of Federal Regulations.
  2. [2]NEVI Formula Program. Federal Highway Administration.

VULTAE Engineering Team — VULTAE engineers design and build AC and DC EV chargers in Qingdao, China, since 2015.

All markets guides →

Equipment

Chargers referred to in this guide

Tell us what you’re building

Send your market, charger type, power and quantity — our engineers reply with matching models, specifications and pricing.

WhatsAppRequest a quote