Skip to content
VULTAE

Sourcing from China

Incoterms and Payment Terms for EV Charger Imports

EXW, FOB, CIF, DAP or DDP for EV charger imports — where cost and risk pass — plus payment terms from T/T deposits to letters of credit.

Prepared by
VULTAE Engineering Team
Published
Reading time
6 min
Sources
2 references

Key takeaways

  1. 1Incoterms decide two things: who pays for each leg of the journey, and where the risk of loss passes from seller to buyer. Under FOB and CIF the risk passes when the goods are loaded on the ship in China — even though under CIF the seller pays the freight.
  2. 2For a first order of chargers, FOB (if you have a forwarder) or CIF / CIP (if you do not) are the simplest rules. DDP sounds easiest but makes the seller the importer in your country, which complicates conformity, tax and warranty.
  3. 3Tie payment to inspection: a deposit at order and the balance after a pre-shipment inspection is the most common structure; a letter of credit gives more protection for large orders at the cost of bank fees and strict paperwork.
  4. 4Write the Incoterm with its named place and version, e.g. “FOB Qingdao, Incoterms 2020” — “FOB China” alone is not a complete term.
Gantry cranes loading a container ship at a busy port at sunset, with stacked containers in the foreground
Gantry cranes loading a container ship at a busy port at sunset, with stacked containers in the foreground
Contents
  1. 01Where cost and risk pass
  2. 02Why DDP is rarely right for chargers
  3. 03Payment terms
  4. 04Letter of credit checklist
  5. 05Practical tips
  6. 06Quoting terms with VULTAE

Short answer: for importing EV chargers, write an Incoterm with a named place and version — for example FOB Qingdao, Incoterms 2020 or CIF Jebel Ali, Incoterms 2020. FOB suits buyers with their own forwarder; CIF or CIP suit buyers who want the supplier to book the freight; DAP suits buyers who want door delivery but will clear customs themselves. Avoid DDP unless you understand who becomes the importer. For payment, a deposit at order and the balance after a pre-shipment inspection is standard; use a letter of credit for large first orders.

Where cost and risk pass

Where cost and risk pass under common Incoterms 2020 rules Journey stages: factory, export clearance, loading at Chinese port, sea freight, destination port, import clearance and duty, delivery to buyer. EXW: buyer pays from the factory. FOB: seller pays to loading on board; risk passes on board. CIF: seller also pays freight and insurance to destination port, but risk passes on board in China. DAP: seller pays to the buyer’s address; buyer pays import duty and clearance; risk passes at delivery. DDP: seller pays everything including import duty. FactoryExportOn boardSea freightDest. portImport dutyYour site EXWFOBCIFDAPDDP seller paysseller pays (incl. freight + insurance)seller paysseller pays everything, incl. import duty buyer pays from the factory gatebuyer paysbuyer paysbuyer ▼ = where risk passes to the buyer. Under CIF the seller pays freight, but the risk passes on board in China.
Cost and risk do not always move together: under CIF the supplier pays the sea freight and minimum insurance, but you carry the risk from the moment the chargers are on board in China.
Rule Seller delivers / pays up to Risk passes Good for
EXW — Ex Works Goods ready at the factory At the factory Experienced importers with a forwarder in China; note the buyer handles export clearance
FCA — Free Carrier Goods handed to your carrier, export-cleared At handover Air freight and consolidated shipments
FOB — Free On Board Goods loaded on the vessel at the named port On board Buyers with their own forwarder — the most common term for sea freight
CIF — Cost, Insurance and Freight Freight and minimum insurance to the destination port On board, at origin Buyers without a forwarder; check the insurance cover
CIP — Carriage and Insurance Paid Carriage and all-risks insurance to a named place At handover to the first carrier Multimodal transport; higher insurance cover than CIF
DAP — Delivered At Place Delivery to your address, not unloaded or import-cleared At delivery Door delivery while you stay the importer
DDP — Delivered Duty Paid Delivery with import duty and taxes paid At delivery Rarely suitable for chargers — see below

Why DDP is rarely right for chargers

Under DDP the seller is the importer of record. For EV chargers that creates problems: in many markets the importer has legal duties for product conformity and labelling (for example in the EU, a responsible economic operator for CE-marked products), import VAT paid by the seller may not be recoverable by you, and warranty returns become more complicated. Most B2B buyers prefer DAP and act as their own importer through a customs broker.

Payment terms

Structure How it works Protection for buyer Typical use
100 % in advance (T/T) Pay before production Low Samples
Deposit + balance before shipment Deposit at order; balance after your or a third-party inspection Medium — you see the goods before the balance Most first orders
Deposit + balance against B/L copy Balance after shipment, on a copy of the bill of lading Medium Repeat orders with a trusted supplier
Letter of credit (L/C) at sight Your bank pays when the seller presents the specified documents High — if you specify an inspection certificate Large first orders
Documents against payment (D/P) Bank releases shipping documents when you pay Medium for buyer, lower for seller Established relationships
Open account Pay after delivery on agreed terms High for buyer Long-term partners with credit insurance

Make the inspection a payment condition. Whatever structure you choose, link the balance to a pre-shipment inspection against your checklist — see how to verify a factory and sample testing.

Letter of credit checklist

If you use an L/C, specify:

  1. Documents required: commercial invoice, packing list, full set of bills of lading, certificate of origin, inspection certificate issued by a named inspection company, insurance certificate (CIF / CIP).
  2. Latest shipment date and expiry date with enough margin for production delays.
  3. Port of loading and destination, partial shipments allowed or not.
  4. The Incoterm, written exactly as in the contract.
  5. That the credit is subject to UCP 600.

Small discrepancies — a misspelt name, a date outside the window — let the bank refuse payment, so agree the draft L/C with the supplier before issuing it.

Practical tips

  • Write the term in full: “FOB Qingdao, Incoterms 2020”, not “FOB price”.
  • Agree who pays destination terminal handling charges under CIF — they are often not included.
  • Under CIF, check the insurance: the minimum cover required by the rule is limited; ask for all-risks cover or buy your own.
  • Pay only to the bank account of the contracting company, and confirm any change of bank details by phone.

Quoting terms with VULTAE

Ask us to quote on the term that suits you — for example FOB Qingdao, CIF / CIP to your port or DAP to your address — and tell us your destination and whether you have a forwarder. Payment terms are agreed per order. See also shipping chargers from China and how to compare quotations.

Questions buyers ask

Which Incoterm is best for buying EV chargers from China?
If you have a freight forwarder, FOB (named Chinese port) gives you control of freight and insurance. If you do not, CIF or CIP to your port lets the supplier arrange shipping, but remember that risk still passes at loading in China. DAP to your address suits buyers who want door delivery but will clear customs themselves.
What is the difference between FOB and CIF?
Under FOB the seller delivers the goods on board the vessel at the Chinese port; the buyer pays sea freight and insurance. Under CIF the seller also pays freight and minimum insurance to the destination port. In both cases the risk passes to the buyer when the goods are on board in China.
Is DDP a good idea for EV chargers?
Use it with care. Under DDP the seller pays import duty and taxes and acts as the importer, which can conflict with product conformity rules, VAT recovery and warranty arrangements in your country. Most B2B buyers of chargers prefer DAP and clear customs themselves.
What payment terms are common for EV chargers?
A deposit when the order is confirmed and the balance before shipment after an inspection is the most common structure. Repeat customers may pay the balance against a copy of the bill of lading. Large orders often use an irrevocable letter of credit.
Is a letter of credit worth it?
For large first orders, yes: the bank pays only when the seller presents the documents you specified, such as an inspection certificate and the bill of lading. The trade-offs are bank fees and the need for documents that match the credit exactly.

References

  1. [1]Incoterms 2020 rules. International Chamber of Commerce.
  2. [2]Uniform Customs and Practice for Documentary Credits (UCP 600). International Chamber of Commerce.

Equipment

Chargers referred to in this guide

Tell us what you’re building

Send your market, charger type, power and quantity — our engineers reply with matching models, specifications and pricing.

Request a quote