Skip to content
VULTAE

Charging Business

Revenue Sharing Models With Site Hosts for EV Charging

How charging operators and landowners share income: fixed rent, revenue share, energy pass-through and hybrid deals, with a worked example.

Prepared by
VULTAE Engineering Team
Published
Reading time
2 min
Sources
—

Key takeaways

  1. 1The common models are fixed rent, a share of net revenue, a share of energy sold, or a hybrid with a low fixed amount plus a share. Each moves risk between the operator and the host in a different way.
  2. 2Define the base before the percentage. A share of gross revenue, revenue after energy cost and net profit are three very different numbers. Write the definition, the reporting and the audit right into the agreement.
  3. 3Spell out who owns the equipment, who pays for power, what happens at the end of the term and who covers faults and insurance.
A site owner and a charging operator shaking hands beside two new DC chargers in a car park
A site owner and a charging operator shaking hands beside two new DC chargers in a car park
Contents
  1. 01Four common models
  2. 02Worked example (illustrative numbers)
  3. 03What the host and operator should agree
  4. 04Pricing and fairness
  5. 05For manufacturers and distributors

Short answer: pick a model, define the revenue base precisely and set reporting, term and exit rules in writing. Test the deal at low, medium and high utilization.

Four common models

Model How the host is paid Best for Risk
Fixed rent A set amount per bay or site Low-use sites; host wants certainty Host loses upside; operator carries use risk
Share of gross revenue A percentage of all customer payments Simple reporting Operator margin shrinks when energy cost is high
Share of net revenue A percentage after energy and fees Fairer in high-cost areas Needs agreed cost definitions
Hybrid Low fixed fee plus a smaller share Many retail and hospitality sites More terms to agree

A fifth variation is energy pass-through: the host supplies the electricity at cost and gets a smaller share on top.

Worked example (illustrative numbers)

A DC charger sells 3,000 kWh a month at 0.45 per kWh, so gross revenue is 1,350. Energy at 0.20 per kWh costs 600. Payment and platform fees take 5% of revenue, 67.50.

Base Amount A 10% share
Gross revenue 1,350.00 135.00
After energy cost 750.00 75.00
After energy and fees 682.50 68.25

The same 10% is worth almost twice as much on gross revenue as on the net figure. This is why the definition matters more than the percentage. Use your own prices and the cost structure to model the real case.

What the host and operator should agree

  1. Equipment and works: who pays for chargers, electrical works and ground works; see what goes into the cost of a charging station.
  2. Power: whose meter, who pays, how demand charges are handled; see demand charges.
  3. Reporting: monthly statements from the platform, with sessions and kWh.
  4. Audit: the host may check the data.
  5. Term and renewal: length, options and what happens at the end.
  6. Uptime and service levels: response time, maintenance; see uptime.
  7. Insurance and liability: see insurance and liability.
  8. Branding and access: signage, customer access rules, payment methods.
  9. Exit: removal, restoration of the site and ownership of equipment.

Pricing and fairness

The host usually wants charging to bring customers to the site; the operator wants margin. If prices are set too high, use falls; if free charging is part of the deal, someone pays for the energy. Agree who sets prices and whether idle fees apply; see idle fees.

For manufacturers and distributors

If you supply chargers to operators, a clear warranty, spare parts plan and remote diagnostics make the operator’s side of the deal reliable. See EV charger warranty. This is general information, not legal advice: have a lawyer review every host agreement.

Questions buyers ask

What share do hosts usually get?
It varies widely by location, power level and who pays for the installation. There is no standard figure. Model the operator’s numbers at several utilization levels and negotiate from there.
Is a fixed rent better for the host?
It is predictable, but the host gives up the upside if the site is busy. A low rent plus a share suits many sites.
Who owns the chargers at the end?
Whatever the agreement says. Decide whether the equipment is removed, bought by the host or renewed, and write the price or the formula down.

Equipment

Chargers referred to in this guide

Tell us what you’re building

Send your market, charger type, power and quantity — our engineers reply with matching models, specifications and pricing.

WhatsAppRequest a quote