  1. 1Size a van depot from energy, not from the number of vans. Estimate energy per van per shift, the hours each van is parked and the supply you can get; the answer decides how many chargers and at what power.
  2. 2Most depots with overnight parking use AC at 11 or 22 kW with load management; a few DC units help with fast turnarounds and top-ups.
  3. 3Plan for growth: ducts and supply capacity are cheaper to install now than to retrofit when the fleet doubles.
A row of electric delivery vans parked overnight at a depot with AC charging posts between the bays
A row of electric delivery vans parked overnight at a depot with AC charging posts between the bays
Contents
  1. 01Step 1: energy
  2. 02Step 2: time
  3. 03Step 3: supply
  4. 04Layout
  5. 05Operations
  6. 06Hardware options

Short answer: start with energy per van per day, then the hours parked, then the supply. Most van depots charge overnight on AC with load management and add a few DC chargers for short turnarounds.

Step 1: energy

Input Example
Daily distance per van 120 km
Consumption 25 kWh per 100 km
Energy per day 30 kWh
Vans 40
Total per day 1,200 kWh

Step 2: time

If vans park for 10 hours, 30 kWh needs only 3 kW per van on average; a 7 kW charger has margin. Short breaks need more power.

Dwell Typical choice
8–12 hours overnight AC 7–11 kW with load management
2–4 hours between shifts AC 22 kW or DC 20–40 kW
Under 1 hour DC 60 kW and above

Step 3: supply

Add the charger load, apply a diversity or load management limit, and compare it with the supply. See dynamic load management and fleet depot sizing.

Layout

  • One charger per bay or one dual-port pedestal per two bays.
  • Cable reach for different van inlet positions.
  • Ducts and spare ways for future bays.
  • Clear traffic flow and lighting.

Operations

  • Driver identification by RFID or app.
  • Scheduling to use off-peak electricity.
  • Reporting per van and per driver.
  • Maintenance plan and spare parts — see the maintenance checklist.

Hardware options

Need VULTAE option
Overnight AC per bay Smart wallbox
Two bays per post Dual-port pedestal
Fast top-up DC wallbox

Questions buyers ask

AC or DC for a van depot?
Overnight parking of eight hours or more usually suits AC. DC is useful for fast turnarounds between shifts or for vans that cannot wait. Many depots use mostly AC and a small number of DC chargers.
How do I size the supply?
Add up energy per van per day, divide by the hours available to charge, and add margin. Use load management to share the supply across chargers and check the result against the utility’s capacity.
Do I need a charge management system?
For more than a few chargers, yes. Scheduling, load sharing and driver identification reduce cost and avoid overloading the supply.