Key takeaways
- 1Size a van depot from energy, not from the number of vans. Estimate energy per van per shift, the hours each van is parked and the supply you can get; the answer decides how many chargers and at what power.
- 2Most depots with overnight parking use AC at 11 or 22 kW with load management; a few DC units help with fast turnarounds and top-ups.
- 3Plan for growth: ducts and supply capacity are cheaper to install now than to retrofit when the fleet doubles.

Short answer: start with energy per van per day, then the hours parked, then the supply. Most van depots charge overnight on AC with load management and add a few DC chargers for short turnarounds.
Step 1: energy
| Input | Example |
|---|---|
| Daily distance per van | 120 km |
| Consumption | 25 kWh per 100 km |
| Energy per day | 30 kWh |
| Vans | 40 |
| Total per day | 1,200 kWh |
Step 2: time
If vans park for 10 hours, 30 kWh needs only 3 kW per van on average; a 7 kW charger has margin. Short breaks need more power.
| Dwell | Typical choice |
|---|---|
| 8–12 hours overnight | AC 7–11 kW with load management |
| 2–4 hours between shifts | AC 22 kW or DC 20–40 kW |
| Under 1 hour | DC 60 kW and above |
Step 3: supply
Add the charger load, apply a diversity or load management limit, and compare it with the supply. See dynamic load management and fleet depot sizing.
Layout
- One charger per bay or one dual-port pedestal per two bays.
- Cable reach for different van inlet positions.
- Ducts and spare ways for future bays.
- Clear traffic flow and lighting.
Operations
- Driver identification by RFID or app.
- Scheduling to use off-peak electricity.
- Reporting per van and per driver.
- Maintenance plan and spare parts — see the maintenance checklist.
Hardware options
| Need | VULTAE option |
|---|---|
| Overnight AC per bay | Smart wallbox |
| Two bays per post | Dual-port pedestal |
| Fast top-up | DC wallbox |
Questions buyers ask
- AC or DC for a van depot?
- Overnight parking of eight hours or more usually suits AC. DC is useful for fast turnarounds between shifts or for vans that cannot wait. Many depots use mostly AC and a small number of DC chargers.
- How do I size the supply?
- Add up energy per van per day, divide by the hours available to charge, and add margin. Use load management to share the supply across chargers and check the result against the utility’s capacity.
- Do I need a charge management system?
- For more than a few chargers, yes. Scheduling, load sharing and driver identification reduce cost and avoid overloading the supply.