Distributors & Installers
Quote Templates for EV Charger Installers: Lines, Options and Terms
A quote template for EV charger installers: survey, hardware, cable, protection, civil works, commissioning, options, exclusions and terms.
- Prepared by
- VULTAE Engineering Team
- Published
- Reading time
- 2 min
- Sources
- —
Key takeaways
- 1A standard quote template saves time and prevents missed items. Build it from your typical jobs: survey, hardware, cable and protection, mounting, civil works, commissioning, approvals and warranty.
- 2Offer good, better and best options and state the exclusions clearly. Customers accept a clear quote more often, and disputes after the job fall.
- 3Keep a price library for hardware, cable, protection devices and labour, review it when costs change and record the assumptions behind each quote.

Contents
Short answer: build a template with fixed lines (survey, hardware, cable and protection, mounting, civil works, commissioning, approvals, warranty), options and clear exclusions. Keep a price library and update it when costs change.
Template lines
| Line | Notes |
|---|---|
| Survey and design | Fixed fee, or credited to the job if the customer accepts |
| Charger hardware | Model, quantity, version (socket or tethered cable) |
| Cable and protection | Breaker, residual current protection, surge protection, cable type, size and length |
| Mounting | Wall, post or plinth; fixings; cable management |
| Civil works | Trenching, ducts, concrete, reinstatement |
| Communication | Network set-up if the charger is smart |
| Commissioning | Tests and signed record |
| Permits and notifications | Who handles them and any fees |
| Warranty | Workmanship period and what it covers |
Good, better, best options
| Tier | Example |
|---|---|
| Good | Basic wallbox, short cable run, standard protection |
| Better | Smart wallbox with load balancing, surge protection |
| Best | Smart wallbox, surge protection, longer warranty, app set-up and handover training |
Show the difference in value, not just in price. See smart charger features for what the upgrade delivers.
Exclusions and assumptions
A quote is only as good as its assumptions. Write down:
- The cable length and route assumed, and the price per extra metre.
- The state of the supply assumed, and what happens if an upgrade is needed.
- Access and working hours.
- Ground conditions for trenching.
- Anything the customer must provide (permits, access, landlord consent).
Compare with what a customer should look for in a quote so your template answers the questions customers ask.
Terms to state
| Term | Content |
|---|---|
| Validity | How long the price holds |
| Payment | Deposit, stage payments, final payment |
| Programme | Start date and duration, dependencies |
| Variations | How extra work is priced and approved |
| Warranty | Workmanship warranty and manufacturer’s warranty |
| Cancellation | Conditions and fees |
Keeping prices current
| Item | How |
|---|---|
| Hardware | Supplier price list and lead times |
| Cable and protection | Wholesaler prices, reviewed regularly |
| Labour | Hourly rate and typical times per task |
| Margin | A standard percentage, reviewed against results |
Track quotes sent, quotes won and the reasons for losses; adjust the template when you see patterns.
After the quote
Link the quote to your commissioning record and handover pack; see the commissioning checklist and the installer partner program for how a manufacturer can support installers.
Questions buyers ask
- Should the quote include the charger?
- Either way, say so clearly. If the customer supplies the charger, state what your warranty covers and what the manufacturer’s warranty covers.
- How should I handle uncertainty on site?
- Use a provisional sum for items that depend on conditions you cannot see, and state how variations will be priced and approved.
- What terms should every quote include?
- Validity period, payment schedule, timeline, access requirements, warranty, exclusions and how changes are handled.
- How detailed should a home-charger quote be?
- Detailed enough that the customer can see what they pay for: survey, charger, cable run, protection, commissioning and warranty, with the cable length stated.


