- 1AFIR, Regulation (EU) 2023/1804, is the EU rule on alternative fuels infrastructure. It sets requirements for public charging points: coverage along the main networks, ad-hoc payment, price transparency, data and technical standards.
- 2It affects both operators and equipment buyers: chargers for public use need payment options, communication standards and data capabilities that meet the regulation and its implementing acts.
- 3Details and dates are set in the regulation and in implementing and delegated acts. Check the current text for your project; this article is a summary, not legal advice.

Contents
Short answer: AFIR is the EU regulation for public charging infrastructure. It sets network coverage targets, ad-hoc payment, price transparency, data sharing and technical standards. If your charger will be publicly accessible in the EU, check the regulation and its implementing acts before you order.
What AFIR covers
| Area | What it asks for |
|---|---|
| Coverage | Minimum charging capacity and spacing along the main road networks |
| Payment | Ad-hoc payment at public points; contactless card for defined points |
| Pricing | Clear prices per kWh, per minute or per session, shown in advance |
| Data | Static and dynamic data for public points to be available |
| Standards | Connectors, communication and smart charging requirements |
What it means for buyers
- Operators need chargers with payment readiness and communication that can meet the standards.
- Importers need technical documentation showing the chargers meet the standards.
- Site owners need to understand which of their points count as public.
Technical points to check
- Connector: Type 2 for AC and CCS2 for DC in the EU — see connector types.
- Communication: the standard required for public points from the stated dates.
- Payment: a terminal or QR option; see payment options.
- Data: OCPP and an operator back end — see OCPP versions.
- Metering and billing: accuracy rules for selling by kWh — see MID-certified chargers.
What AFIR does not replace
CE marking and product safety rules still apply, as do national installation rules and metering law. See certifications.
For the full regulatory text, read the regulation on EUR-Lex; this page is a summary only.
Questions buyers ask
- Does AFIR apply to private chargers?
- It applies to publicly accessible recharging points. Private chargers at homes or closed company sites are generally outside its main requirements.
- What payment must public chargers offer?
- AFIR requires ad-hoc payment options at public points, with card payment requirements for new points under defined conditions. Check the regulation for power thresholds and dates.
- What communication standard applies?
- Implementing rules require specific communication standards for public points from set dates, including ISO 15118-20 for points installed or renovated from 1 January 2027 — see the [connectors and protocols guide](/guides/ev-charging-connectors-and-protocols/).